SHARP CHEMICAL IND.CO.,LTD. The best choice. Here is DIY instructions.

SHARP IND.CO.,LTD.

HOME > Instructions > Construction of SHARPIE BATHSEAL

Construction of SHARPIE BATHSEAL

Step1
Before construction
Before construction

Make sure the construction location clean and dry.

 
Step2
Under preparation
Under preparation

Please prepare scraper, masking tapes, towels. If you use cartridges, please prepare glue gun.

 
Step3
Open the mouth
管嘴开封

Use the nozzle to puncture the mouth. If it is difficult to open, you can use sticker to puncture the mouth.

Step4
Paint
涂刷

Use the masking tape to prevent from applying needless parts.

 
Step5
After paint
AFTER PAINT

The masking tape should be stick directly along the two sides of the cracks.

 
Step6
Cut the nozzle off
cut off

The nozzle size should be cut according to the size of cracks. It is recommended that cutting before opening the mouth of the tube.

Step7
Under construction
under construction

Squeeze the silicone out with two hands.

 
Step8
Under construction
正在施工

The hands maybe tired, but please keep the construction with same strength.

 
Step9
Use scraper
Scraper

To strengthen the glutinosity, you can use scraper to press the filler.

Step10
Compress by scrapper
compress

Now the filling part is end here. Then strickle with certain strength and speed.

 
Step11
Rip the tapes off
rip

Do it carefully to prevent from polluting the surroundings. If the hands touch the filler, please wash hands as soon as possible.

 
Step12
The end
end

Surface cure takes about 20 minutes. Some location like the joints of bathroom need about half day.

Instructions
Contact us

We are looking forward to your inquiries!

TEL:072-268-0321/FAX:072-268-0326
mail:info@sharpchem.co.jp (click here to our mailbox)
Back to top

homepage Introduction of company OEM Q&A sitemap SHARP CHEMICAL IND.CO.,LTD. Contact us