Construction of SHARPIE BATHSEAL
Step1
Before construction
Make sure the construction location clean and dry. |
|
Step2
Under preparation
Please prepare scraper, masking tapes, towels. If you use cartridges, please prepare glue gun.
|
|
Step3
Open the mouth
Use the nozzle to puncture the mouth. If it is difficult to open, you can use sticker to puncture the mouth.
|
Step4
Paint
Use the masking tape to prevent from applying needless parts.
|
|
Step5
After paint
The masking tape should be stick directly along the two sides of the cracks.
|
|
Step6
Cut the nozzle off
The nozzle size should be cut according to the size of cracks. It is recommended that cutting before opening the mouth of the tube.
|
Step7
Under construction
Squeeze the silicone out with two hands.
|
|
Step8
Under construction
The hands maybe tired, but please keep the construction with same strength.
|
|
Step9
Use scraper
To strengthen the glutinosity, you can use scraper to press the filler.
|
Step10
Compress by scrapper
Now the filling part is end here. Then strickle with certain strength and speed.
|
|
Step11
Rip the tapes off
Do it carefully to prevent from polluting the surroundings. If the hands touch the filler, please wash hands as soon as possible.
|
|
Step12
The end
Surface cure takes about 20 minutes. Some location like the joints of bathroom need about half day.
|